BOE Pipeline

For Pipeline Emergency Call Bismark Control Center – 844-220-9234

BOE Pipeline is a 39 mile, 16-inch diameter pipeline operating between our Kildeer terminal and our existing Bakken Oil Express rail facility west of Dickinson.  It has the capacity to move 165,000 bopd.  The pipeline provides a safe and efficient means of transporting large volumes of crude oil to our rail facility, and will help to reduce truck traffic on the highway.

Tariffs
  1. BOEPL-FERC 2.2.0-RATES- Effective 07.01.2015
  2. BOEPL-FERC 1.0.0-Rules and Regulations – Effective 07.01.2014
  3. THPPC & BOEPL Joint Tariff – FERC 4.1.0 RATES-Effective 07.01.2015
  4. THPPC & BOEPL Joint Tariff – FERC 4.2.0 RATES –Effective 06.01.2016
  5. BOEPL-FERC 2.3.0 RATES-Pending 06.01.2016 – Effective 07.01.2016
  6. THPPC &BOEPL Joint Tariff – FERC 4.4.0 (Pending) Effective 07.01.2017
LL Terminals – Access Agreement
Public Awareness
  1. North Dakota One Call
  2. National One Call
  3. North Dakota Pipeline Authority
  4. Bismark Control Center 844-220-9234
  5. Pipeline Awareness for Public Safety
  6. Crude Oil Pipelines in Your Community
EH&S Policy
  1. BOE Environmental Policy
  2. BOE Safety Policy
Nominations to BOE Pipeline

BOE_Pipeline5-20-14sm